New Jersey Department of Agriculture Soil Erosion and Sediment Control Program
Soil Compaction Mitigation Verification Form
Authority: N.J.S.A. 4:24-39 et seq, and P.L. 2010, Chpt. 113
Instructions. This form is to be used only when your soil erosion and sediment control plan denotes areas of the site that are subject to soil compaction mitigation (testing and/or remediation) in accordance with the Standard for Land Grading, N.J.A.C. 2:90-1.3 (a)2, Chpt. 19 (rev. 2017). You have the option to test subsoil in areas of your site for excessive soil compaction. However, remediation (tilling or ripping 6” deep) is required in these areas if testing determines that subsoils are excessively compacted (see below). This form must be filled out completely and submitted to the local soil conservation district prior to the district performing a Report of Compliance inspection.
If an inspection is being requested during a non-growing season (typically summer and winter), testing and/or remediation work may be postponed (box III below) until the next optimum growing season. A new self-certification form will be required at that time when compaction testing or remediation, and vegetation establishment is done.
Soil Compaction Mitigation Verification Form
Authority: N.J.S.A. 4:24-39 et seq, and P.L. 2010, Chpt. 113
Instructions. This form is to be used only when your soil erosion and sediment control plan denotes areas of the site that are subject to soil compaction mitigation (testing and/or remediation) in accordance with the Standard for Land Grading, N.J.A.C. 2:90-1.3 (a)2, Chpt. 19 (rev. 2017). You have the option to test subsoil in areas of your site for excessive soil compaction. However, remediation (tilling or ripping 6” deep) is required in these areas if testing determines that subsoils are excessively compacted (see below). This form must be filled out completely and submitted to the local soil conservation district prior to the district performing a Report of Compliance inspection.
If an inspection is being requested during a non-growing season (typically summer and winter), testing and/or remediation work may be postponed (box III below) until the next optimum growing season. A new self-certification form will be required at that time when compaction testing or remediation, and vegetation establishment is done.